Product Overview
This equipment is intended for liquid beverage projects comparing different configurations of bottle rinsing, liquid filling, and screw capping. Configuration is discussed using bottle size, liquid properties, filling temperature, cap route, utilities, installation space, and the required operating plan.
The machine integrates the three core operations on one platform. Bottles enter through the confirmed infeed route, are rinsed, receive the prepared liquid, and proceed to screw capping and outfeed. The reference configurations provide a basis for comparing heads, water consumption, power, dimensions, and weight. The stated capacity figures are linked to a 500 mL reference and are not unconditional output promises for every bottle, liquid, cap, or operating condition.
Liquid viscosity, foam, particles, product temperature, bottle height, neck geometry, cap type, bottle material, and bottle transfer behavior affect the selection. Filling temperature may be ambient, hot filling, or low temperature according to the confirmed project. Rinsing water pressure, compressed air, power, thermal service, drainage, maintenance access, and factory layout are checked before the final arrangement. Reference liquid-level positioning is evaluated under product and test conditions.
The project discussion can cover bottle infeed, rinsing water connection, filling inlet, filling station, screw capping, cap handling, outfeed conveyor, utility routing, and maintenance access. Workshop layout planning, installation coordination, commissioning, operator guidance, and full-set technical support can be discussed. The final configuration is selected from the project requirements and the applicable reference table, without treating high speed as an unconditional performance result.
Applications
This machine can be considered for liquid beverage projects requiring a higher-output selection of bottle rinsing, liquid filling, and screw capping equipment. Fruit juice, tea beverage, coffee drink, protein drink, non-soda drink, and other confirmed liquid beverages can be reviewed. Product, bottle, cap, temperature, utilities, and downstream interface conditions require confirmation.
Line Modules
- Bottle infeed interface. Bottle supply and transfer are reviewed according to the selected configuration and site layout.
- Bottle rinsing unit. The rinsing station is selected with bottle opening, water route, and process conditions in mind.
- Rinsing water connection. Water pressure, consumption, supply, and drainage are reviewed by project.
- Liquid product inlet. The filling inlet is coordinated with the prepared liquid transfer route.
- Liquid filling unit. The filling station is selected for product, bottle, temperature, and project conditions.
- Liquid-level positioning interface. The ±3 mm reference is reviewed with product, bottle, and test conditions.
- Screw capping unit. The capping station is configured for the selected neck and screw cap.
- Cap handling interface. Cap supply, orientation, and transfer are reviewed according to package requirements.
- Bottle outfeed conveyor. Filled and capped bottles move to the confirmed outfeed route.
- Utility and maintenance interface. Water, air, power, thermal service, access, and maintenance are reviewed.
Process Flow
Bottle infeed → bottle rinsing → liquid filling → screw capping → bottle outfeed to the confirmed downstream interface.
The reference configuration is selected by bottle, liquid, target operating plan, utilities, and site conditions. Upstream preparation and downstream packing remain separate interfaces unless confirmed.
Equipment Parameters
| Model | 500 mL Reference Capacity (bottles/hour) | Rinsing / Filling / Capping Heads | Rinsing Water Consumption | Power | Dimension | Total Weight |
|---|---|---|---|---|---|---|
| SW8-8-3 | 2,000–3,000 | 8 / 8 / 3 | 300 kg/h | 3 kW | 1,900*1,600*2,250 mm | 1,500 kg |
| SW12-12-5 | 3,000–4,000 | 12 / 12 / 5 | 450 kg/h | 4 kW | 2,100*1,800*2,250 mm | 2,200 kg |
| SW18-18-6 | 6,000–8,000 | 18 / 18 / 6 | 800 kg/h | 5.5 kW | 2,650*2,100*2,250 mm | 3,500 kg |
| SW24-24-8 | 10,000–12,000 | 24 / 24 / 8 | 1,500 kg/h | 6.5 kW | 3,300*2,200*2,250 mm | 4,500 kg |
| SW40-40-15 | 15,000–20,000 | 40 / 40 / 15 | 2,500 kg/h | 7.5 kW | 4,200*2,300*2,750 mm | 7,500 kg |
| SW50-50-15 | 26,000–28,000 | 50 / 50 / 15 | 3,000 kg/h | 9 kW | 4,600*3,500*2,700 mm | 8,300 kg |
These are 500 mL reference values for comparing configurations, not unconditional output promises. Shared references include liquid-level positioning of ±3 mm, bottle height of 150–330 mm, round or square neck inner diameter of Φ50–Φ100 mm, rinsing water pressure of 0.2–0.25 MPa, air supply of 0.7 MPa and 0.8 m³/min, filling temperature options of ambient, hot filling, or low temperature, and power supply of 380±10 V, 50 Hz. Actual selection requires project confirmation.
Technical Guidance and Services
Support can include configuration comparison, bottle and cap review, liquid condition discussion, rinsing-water and air coordination, filling-temperature review, workshop layout planning, installation coordination, commissioning, operator guidance, and full-set technical support. The final service scope follows the confirmed operating plan and site conditions.
Product FAQ
Q1: Does the high-speed direction define a fixed output?
No. The table provides 500 mL reference capacities for comparing configurations. Actual results depend on bottle, liquid, cap, utilities, tests, and project conditions.
Q2: How should a configuration be selected?
Bottle volume, liquid properties, target operating plan, rinsing water, power, air supply, installation space, and package route should be reviewed together.
Q3: Does the equipment include a complete beverage line?
No. The core scope is bottle rinsing, liquid filling, and screw capping. Upstream and downstream systems are separate interfaces unless confirmed.
Q4: Can installation and commissioning support be provided?
Yes. Project-based installation coordination, commissioning, operator guidance, workshop planning, and technical support can be discussed.