logo
Home > Products > Bottle Filling machine > 3 In 1 PET Bottle Filling Machine Rinsing Capping Equipment Customized

3 In 1 PET Bottle Filling Machine Rinsing Capping Equipment Customized

Place of Origin
Shanghai, China
Brand Name
Shangwang
Certification
ISO 9001
Model Number
SW8-8-3 / SW12-12-5 / SW18-18-6 / SW24-24-8 / SW40-40-15 / SW50-50-15
Minimum Order Quantity
1 Set
Packaging Details
Export standard packaging
Delivery Time
3-6 months
Payment Terms
T/T,L/C,Western Union
Product Attributes
Highlight:

customized pet bottle filling machine

,

Capping pet bottle filling machine

,

customized bottle rinsing machine

Material:
Stainless Steel
After-sales Service:
Project-based Installation, Commissioning, Training And After-sales Support
Application:
Confirmed PET Bottle Liquid Product
Process Scope:
Bottle Rinsing, Liquid Filling And Screw Capping
Automation:
Configurable According To Project Requirements
Control:
Control Arrangement According To Project Requirements
Product Description
Reading Progress
0%

Product Overview

Bottle Rinsing Filling and Capping Machine for PET Bottles. This equipment is planned around PET bottle projects that require bottle rinsing, liquid filling, and screw capping in one equipment route. The PET bottle is supplied through the selected infeed arrangement, passes through the rinsing station, receives the confirmed liquid at the selected process condition, and proceeds to screw capping and bottle outfeed. The package route, cap, liquid, and utilities are reviewed before final configuration.
The PET focus is an application direction rather than an unconditional statement that every PET bottle is compatible. Bottle height, neck inner diameter, neck shape, bottle wall behavior, bottle base, cap type, bottle temperature, liquid condition, and transfer method affect the review. The bottle information should be supplied before the equipment interface is finalized. A PET bottle used for ambient filling may require a different review from a PET bottle intended for a thermal filling project.
The rinsing, filling, and capping operations remain the core single-machine scope. The equipment does not automatically include PET preform handling, bottle blowing, water treatment, beverage preparation, sterilization, or downstream packing. Those systems may be connected as separate interfaces when the project calls for them. This keeps the product page focused on the integrated three-operation machine and helps purchasers distinguish the equipment from a complete PET beverage line.
Liquid compatibility is reviewed with viscosity, foam, particles, temperature, product inlet conditions, and required filling method. Screw capping is reviewed with the selected neck and cap, including cap supply and transfer. The filling temperature can be considered for ambient, hot filling, or low-temperature projects, but the selected condition must be assessed together with the PET bottle, closure, liquid, and utilities. Rinsing water, compressed air, power, and any thermal service are checked against the site.
The equipment route can include PET bottle infeed, rinsing water connection, liquid inlet, filling station, screw cap supply, capping station, bottle outfeed, conveyor connection, and maintenance access. Workshop layout planning considers bottle movement, operator access, utility routing, cleaning coordination, and downstream interface space. Installation coordination, commissioning, operator guidance, and full-set technical support can be discussed according to the project.

Applications

This machine can be considered for confirmed PET bottle liquid beverage and liquid food projects requiring rinsing, liquid filling, and screw capping.

Line Modules

  1. PET bottle infeed interface. The PET bottle supply route is reviewed according to the confirmed container and workshop layout.
  2. PET bottle rinsing unit. The rinsing station is coordinated with the bottle opening, material, water route, and process conditions.
  3. Rinsing water connection. Water pressure, supply, drainage, and site connection requirements are reviewed.
  4. PET liquid inlet. The liquid inlet is coordinated with the prepared product transfer route.
  5. Liquid filling unit. The filling station is reviewed for the liquid, PET bottle, temperature, and filling conditions.
  6. Liquid-level positioning interface. The positioning reference is evaluated with the product, bottle, and test conditions.
  7. Screw capping unit. The capping station is reviewed for the PET neck and confirmed screw cap.
  8. Cap handling interface. Cap delivery, orientation, and transfer are configured according to the package.
  9. PET bottle outfeed conveyor. Filled and capped PET bottles move to the confirmed outfeed route.
  10. Utility and maintenance interface. Water, air, power, access, cleaning coordination, and maintenance requirements are reviewed.

Process Flow

PET bottle infeed → bottle rinsing → liquid filling → screw capping → PET bottle outfeed to the confirmed downstream interface.

Equipment Parameters

Model 500 mL Reference Capacity (bottles/hour) Rinsing / Filling / Capping Heads Rinsing Water Consumption Power Dimension Total Weight
SW8-8-3 2,000–3,000 8 / 8 / 3 300 kg/h 3 kW 1,900*1,600*2,250 mm 1,500 kg
SW12-12-5 3,000–4,000 12 / 12 / 5 450 kg/h 4 kW 2,100*1,800*2,250 mm 2,200 kg
SW18-18-6 6,000–8,000 18 / 18 / 6 800 kg/h 5.5 kW 2,650*2,100*2,250 mm 3,500 kg
SW24-24-8 10,000–12,000 24 / 24 / 8 1,500 kg/h 6.5 kW 3,300*2,200*2,250 mm 4,500 kg
SW40-40-15 15,000–20,000 40 / 40 / 15 2,500 kg/h 7.5 kW 4,200*2,300*2,750 mm 7,500 kg
SW50-50-15 26,000–28,000 50 / 50 / 15 3,000 kg/h 9 kW 4,600*3,500*2,700 mm 8,300 kg

 

Product FAQ

Q1: Can PET bottle compatibility be reviewed?
Yes. Bottle height, neck shape, inner diameter, material, cap, liquid, temperature, and handling conditions are reviewed from the project information.
Q2: Does the equipment include bottle blowing?
No. The single-machine scope is bottle rinsing, liquid filling, and screw capping. Bottle blowing and upstream or downstream systems are separate project interfaces.
Q3: Can hot filling be considered for a PET bottle project?
Hot filling can be considered as a project direction. The liquid temperature, PET bottle, cap, utilities, and package conditions require confirmation.
Q4: Can installation and commissioning support be provided?
Yes. Project-based installation coordination, commissioning, operator guidance, workshop planning, and technical support can be discussed.
Q5: Can you supply a complete production line, not just a single machine?
A: Yes. We can supply complete turnkey lines including all processing equipment.
Q6: Can we visit your factory?
A: Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.

Ready To Get Started?
Contact Us Today For A Free Consultation And See How We Can Help Your Business Grow.