PET Bottle Mineral Water Liquid Filling Machine For Beverage Packaging

Place of Origin
Shanghai, China
Brand Name
Shangwang
Certification
ISO 9001
Model Number
SW8-8-3 / SW12-12-5 / SW18-18-6 / SW24-24-8 / SW40-40-15 / SW50-50-15
Minimum Order Quantity
1 Set
Packaging Details
Export standard packaging
Delivery Time
3-6 months
Payment Terms
T/T,L/C,Western Union
Product Attributes
Highlight:

PET Bottle liquid filling machine

,

Beverage liquid filling machine

,

PET Bottle mineral water filling machine

Material:
Stainless Steel
After-sales Service:
Project-based Installation, Commissioning, Training And After-sales Support
Automation:
Configurable According To Project Requirements
Control:
Control Arrangement According To Project Requirements
Product Description
Reading Progress
0%

Product Overview

PET Bottle Three in One Filling Machine for Beverage Packaging. This equipment is planned around PET bottle projects requiring bottle rinsing, liquid filling, and screw capping in one machine route. PET bottles enter through the selected infeed arrangement, move through the rinsing station, receive the confirmed liquid, and proceed to screw capping and outfeed. Bottle material, neck geometry, cap, liquid, filling condition, and utilities are reviewed before final configuration.
The PET direction is an application focus and does not mean that every PET bottle, neck, cap, or filling condition is automatically compatible. Bottle height, neck inner diameter, neck shape, wall behavior, base design, cap type, liquid temperature, viscosity, foam, particles, and transfer conditions affect the review. Bottle drawings and cap information should be supplied for interface assessment. A project involving ambient filling may require different discussion from one involving thermal filling.
The core single-machine scope is limited to rinsing, liquid filling, and screw capping. The equipment does not automatically include PET preform handling, bottle blowing, water treatment, beverage preparation, sterilization, or final packing. Such systems can be connected separately if confirmed in the project. Keeping the scope defined helps purchasers compare the integrated three-operation machine with wider PET production equipment without confusing the equipment boundary.
The liquid filling station is reviewed against the product inlet, temperature, foam, viscosity, particles, and container opening. The capping station is reviewed against the PET neck and selected screw cap, including cap supply and transfer. Filling temperature options can include ambient, hot filling, or low temperature as project directions, but the selected condition must be assessed together with bottle, closure, liquid, and utilities. Rinsing water, compressed air, electrical supply, and any thermal service are checked against the factory.
The route can include PET bottle infeed, rinsing water connection, liquid inlet, filling station, cap handling, capping station, bottle outfeed, conveyor interface, and maintenance access. Workshop layout planning considers bottle movement, operator access, utility routing, cleaning coordination, and downstream connection space. Installation coordination, commissioning, operator guidance, and technical support can be discussed according to the confirmed project.

Applications

This machine can be considered for confirmed PET bottle beverage and liquid food packaging projects requiring rinsing, liquid filling, and screw capping. PET bottle compatibility, neck geometry, cap format, liquid temperature, viscosity, foam, particles, and package route require review.

Line Modules

  1. PET bottle infeed interface. The PET bottle supply route is reviewed according to container and workshop arrangement.
  2. PET bottle rinsing unit. The rinsing station is coordinated with the bottle opening, material, water route, and process conditions.
  3. Rinsing water connection. Water pressure, supply, drainage, and site connection requirements are reviewed.
  4. PET liquid inlet. The product inlet is coordinated with the prepared liquid transfer route.
  5. Liquid filling unit. The filling station is reviewed for liquid, PET bottle, temperature, and filling conditions.
  6. Liquid-level positioning interface. The positioning reference is evaluated with product, bottle, and test conditions.
  7. Screw capping unit. The capping station is reviewed for the PET neck and confirmed screw cap.
  8. Cap handling interface. Cap delivery, orientation, and transfer are configured according to package requirements.
  9. PET bottle outfeed conveyor. Filled and capped bottles move to the confirmed outfeed route.
  10. Utility and maintenance interface. Water, air, power, access, cleaning coordination, and maintenance are reviewed.

Process Flow

PET bottle infeed → bottle rinsing → liquid filling → screw capping → PET bottle outfeed to the confirmed downstream interface.

Equipment Parameters

Model 500 mL Reference Capacity (bottles/hour) Rinsing / Filling / Capping Heads Rinsing Water Consumption Power Dimension Total Weight
SW8-8-3 2,000–3,000 8 / 8 / 3 300 kg/h 3 kW 1,900*1,600*2,250 mm 1,500 kg
SW12-12-5 3,000–4,000 12 / 12 / 5 450 kg/h 4 kW 2,100*1,800*2,250 mm 2,200 kg
SW18-18-6 6,000–8,000 18 / 18 / 6 800 kg/h 5.5 kW 2,650*2,100*2,250 mm 3,500 kg
SW24-24-8 10,000–12,000 24 / 24 / 8 1,500 kg/h 6.5 kW 3,300*2,200*2,250 mm 4,500 kg
SW40-40-15 15,000–20,000 40 / 40 / 15 2,500 kg/h 7.5 kW 4,200*2,300*2,750 mm 7,500 kg
SW50-50-15 26,000–28,000 50 / 50 / 15 3,000 kg/h 9 kW 4,600*3,500*2,700 mm 8,300 kg

Product FAQ

  • Q1: Can PET bottle compatibility be reviewed?
    Yes. Bottle height, neck shape, inner diameter, material, cap, liquid, temperature, and handling conditions are reviewed from project information.
  • Q2: Does the equipment include bottle blowing?
    No. The single-machine scope is bottle rinsing, liquid filling, and screw capping. Bottle blowing is a separate interface.
  • Q3: Can hot filling be considered?
    Hot filling can be considered as a project direction. Liquid temperature, PET bottle, cap, utilities, and package conditions require confirmation.
  • Q4: Can installation and commissioning support be provided?
    Yes. Project-based installation coordination, commissioning, operator guidance, workshop planning, and technical support can be discussed.
  • Q3: Can you supply a complete production line, not just a single machine?
    A: Yes. We can supply complete turnkey lines including all processing equipment.
  • Q4: Can we visit your factory?
    A: Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.
Ready To Get Started?