Three In One Carbonated Beverage Bottle Filling Machine Rinsing Capping OEM
OEM beverage bottle filling machine
,Rinsing beverage bottle filling machine
,Rinsing carbonated filling machine
Product Overview
Three in One Bottle Rinsing Filling and Capping Machine. This equipment integrates three core operations on one machine platform: bottle rinsing, liquid filling, and screw capping. It is intended for projects that want these operations coordinated in one compact equipment route, while bottle supply, product preparation, downstream conveying, and final packing remain subject to the confirmed process layout.
The rinsing section receives bottles through the selected infeed arrangement and presents them to the rinsing station. The filling section is reviewed for the confirmed liquid, bottle opening, filling temperature, liquid behavior, and required transfer conditions. The screw capping section is arranged around the selected closure and cap supply route. These three operations are linked through the machine sequence, but the actual bottle, liquid, cap, and utility compatibility must be reviewed for each project.
Upstream filtration, product preparation, thermal treatment, cleaning, bottle supply, cap supply, and downstream packing may be connected as separate project interfaces where required. The equipment scope remains focused on rinsing, liquid filling, and screw capping. This helps buyers define the required single-machine boundary before discussing a workshop layout or wider production route.
Bottle height, neck geometry, bottle material, liquid temperature, viscosity, foam, particles, and cap design affect the project review. Filling temperature can be considered for ambient, hot filling, or low-temperature applications, but the selected condition must be matched with the bottle, closure, liquid, and site utilities. Rinsing water pressure, compressed air, electrical supply, and any thermal service are reviewed against the factory conditions. Automation and control can be configured according to the confirmed operating and interface requirements.
The equipment can support a practical discussion around bottle infeed, rinsing water return or discharge, liquid inlet, cap delivery, screw capping, bottle outfeed, and conveyor connection. Installation space, maintenance access, operator movement, utility routing, and cleaning coordination are considered during project planning. Process interface review, workshop layout planning, installation coordination, commissioning, and full-set technical guidance can be discussed as part of the equipment project.
Applications
This machine can be considered for confirmed liquid beverage and liquid food projects requiring bottle rinsing, liquid filling, and screw capping in one equipment route. Specific product conditions, bottle material, neck design, cap type, temperature, viscosity, foam, particles, and package route require application review. It is a single-machine solution for the three stated operations and does not represent a complete beverage production line.
Line Modules
- Bottle infeed interface. The bottle supply route is reviewed according to the confirmed container and workshop arrangement.
- Bottle rinsing unit. The rinsing station is configured around the bottle opening, bottle material, rinsing water route, and process requirements.
- Rinsing water connection. Water supply, pressure, drainage, and coordination with the site are reviewed by project.
- Liquid product inlet. The filling inlet is coordinated with the upstream liquid transfer route.
- Liquid filling unit. The filling station is reviewed for the liquid, bottle, temperature, and filling conditions.
- Filling-level interface. The selected liquid-level positioning reference is evaluated with the product, bottle, and test conditions.
- Screw capping unit. The capping station is configured for the confirmed screw cap and bottle neck.
- Cap supply interface. Cap delivery, orientation, and handling are reviewed according to the package route.
- Bottle outfeed conveyor. Filled and capped bottles are transferred to the confirmed outfeed route.
- Utility and maintenance interface. Power, air, water, access, cleaning coordination, and maintenance requirements are reviewed.
Process Flow
Bottle infeed → bottle rinsing → liquid filling → screw capping → bottle outfeed to the confirmed downstream interface.
The three-in-one sequence is connected on one equipment platform.
Equipment Parameters
| Model | 500 mL Reference Capacity (bottles/hour) | Rinsing / Filling / Capping Heads | Rinsing Water Consumption | Power | Dimension | Total Weight |
|---|---|---|---|---|---|---|
| SW8-8-3 | 2,000–3,000 | 8 / 8 / 3 | 300 kg/h | 3 kW | 1,900*1,600*2,250 mm | 1,500 kg |
| SW12-12-5 | 3,000–4,000 | 12 / 12 / 5 | 450 kg/h | 4 kW | 2,100*1,800*2,250 mm | 2,200 kg |
| SW18-18-6 | 6,000–8,000 | 18 / 18 / 6 | 800 kg/h | 5.5 kW | 2,650*2,100*2,250 mm | 3,500 kg |
| SW24-24-8 | 10,000–12,000 | 24 / 24 / 8 | 1,500 kg/h | 6.5 kW | 3,300*2,200*2,250 mm | 4,500 kg |
| SW40-40-15 | 15,000–20,000 | 40 / 40 / 15 | 2,500 kg/h | 7.5 kW | 4,200*2,300*2,750 mm | 7,500 kg |
| SW50-50-15 | 26,000–28,000 | 50 / 50 / 15 | 3,000 kg/h | 9 kW | 4,600*3,500*2,700 mm | 8,300 kg |
Actual compatibility and operating conditions require project confirmation.
Technical Guidance and Services
Support can include bottle and cap interface review, liquid condition discussion, rinsing water and air utility review, filling-temperature discussion, workshop layout planning, installation coordination, commissioning, operator guidance, and full-set technical support. The final service scope is confirmed according to the equipment boundary, site conditions, and project interfaces.
Product FAQ
Q1: What does this three-in-one machine integrate?
It integrates bottle rinsing, liquid filling, and screw capping in one equipment route. Upstream preparation and downstream packing are reviewed separately.
Q2: What bottle types can be considered?
Bottle height, neck shape, neck interface, material, cap, and handling conditions are reviewed from the customer bottle information. Compatibility is confirmed by project.
Q3: Can the filling temperature be ambient, hot filling, or low temperature?
These are project directions listed for review. The liquid, bottle, closure, utilities, and operating conditions must be evaluated together.
Q4: Do you provide installation and commissioning support?
Yes. Project-based installation coordination, commissioning, operator guidance, workshop planning, and technical support can be discussed.
Q3: Can you supply a complete production line, not just a single machine?
A: Yes. We can supply complete turnkey lines including all processing equipment.
Q4: Can we visit your factory?
A: Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.