ODM Stainless Steel Liquid Beverage Bottle Filling Machine Automatic 300kg/H
ODM beverage bottle filling machine
,300kg/h beverage bottle filling machine
,300kg/h liquid filling machine automatic
Product Overview
Hot Filling Three in One Bottle Rinsing Filling and Capping Machine. This equipment is planned for projects evaluating hot filling together with bottle rinsing, liquid filling, and screw capping. It connects the prepared hot liquid inlet with the filling station, coordinates bottle rinsing and package handling, and transfers filled and capped bottles to the confirmed outfeed route. The hot filling direction is a project condition and must be reviewed with the liquid, bottle, closure, and thermal service.
Hot filling review includes product temperature, filling sequence, bottle material, bottle geometry, neck opening, cap design, cooling or handling requirements, and site utilities. The selected bottle and closure must be considered with the hot liquid. The equipment also supports review of ambient or low-temperature directions where appropriate, but the title focuses on the hot filling project intent. The filling-level positioning reference is not an unconditional result guarantee and must be checked with product, bottle, and test conditions.
Rinsing water pressure, compressed air, electrical supply, and thermal service are checked against the factory. Bottle height, neck inner diameter, neck shape, cap type, liquid viscosity, foam, particles, and container behavior affect the application. The equipment can be arranged with bottle infeed, rinsing water connection, liquid inlet, filling station, screw capping, cap supply, bottle outfeed, conveyor connection, and maintenance access.
Workshop layout planning considers heat-service routing, operator access, bottle movement, cap handling, cleaning coordination, ventilation, and downstream connection space. Installation coordination, commissioning, operator guidance, and full-set technical support can be discussed according to the confirmed hot filling project. The final arrangement depends on confirmed product and packaging information.
Applications
This machine can be considered for confirmed hot filling beverage and liquid food projects requiring bottle rinsing, liquid filling, and screw capping. Product temperature, bottle material, bottle geometry, cap, liquid behavior, thermal service, and package route require review.
Line Modules
- Hot liquid inlet. The prepared liquid connection and thermal condition are reviewed with the upstream route.
- Bottle infeed interface. Bottle supply and transfer are coordinated with the hot filling project.
- Bottle rinsing unit. The rinsing station is reviewed for bottle opening, water route, and process conditions.
- Rinsing water connection. Water pressure, supply, drainage, and site connections are checked.
- Hot liquid filling unit. The filling station is reviewed for product temperature, bottle, and filling conditions.
- Temperature and level interface. Product temperature and liquid-level positioning references are evaluated by project.
- Screw capping unit. The capping station is coordinated with the bottle neck and selected screw cap.
- Cap handling interface. Cap delivery, orientation, and transfer are reviewed with the package route.
- Bottle outfeed conveyor. Filled and capped bottles move to the confirmed outfeed route.
- Thermal, utility, and maintenance interface. Heat service, air, water, power, access, and maintenance are reviewed.
Process Flow
Bottle infeed → bottle rinsing → project-confirmed hot liquid filling → screw capping → bottle outfeed to the confirmed downstream interface.
Upstream heating, product preparation, cap supply, cooling, downstream conveying, and final packing are included only when separately confirmed. The core equipment remains rinsing, filling, and capping.
Equipment Parameters
| Model | 500 mL Reference Capacity (bottles/hour) | Rinsing / Filling / Capping Heads | Rinsing Water Consumption | Power | Dimension | Total Weight |
|---|---|---|---|---|---|---|
| SW8-8-3 | 2,000–3,000 | 8 / 8 / 3 | 300 kg/h | 3 kW | 1,900*1,600*2,250 mm | 1,500 kg |
| SW12-12-5 | 3,000–4,000 | 12 / 12 / 5 | 450 kg/h | 4 kW | 2,100*1,800*2,250 mm | 2,200 kg |
| SW18-18-6 | 6,000–8,000 | 18 / 18 / 6 | 800 kg/h | 5.5 kW | 2,650*2,100*2,250 mm | 3,500 kg |
| SW24-24-8 | 10,000–12,000 | 24 / 24 / 8 | 1,500 kg/h | 6.5 kW | 3,300*2,200*2,250 mm | 4,500 kg |
| SW40-40-15 | 15,000–20,000 | 40 / 40 / 15 | 2,500 kg/h | 7.5 kW | 4,200*2,300*2,750 mm | 7,500 kg |
| SW50-50-15 | 26,000–28,000 | 50 / 50 / 15 | 3,000 kg/h | 9 kW | 4,600*3,500*2,700 mm | 8,300 kg |
These capacity figures are 500 mL reference values for project comparison, not unconditional output promises. Shared references include liquid-level positioning of ±3 mm, bottle height of 150–330 mm, round or square neck inner diameter of Φ50–Φ100 mm, rinsing water pressure of 0.2–0.25 MPa, air supply of 0.7 MPa and 0.8 m³/min, filling temperature options of ambient, hot filling, or low temperature, and power supply of 380±10 V, 50 Hz. Hot filling compatibility requires project confirmation.
Technical Guidance and Services
Support can include product temperature review, bottle and cap material discussion, thermal utility coordination, rinsing-water and air review, workshop layout planning, installation coordination, commissioning, operator guidance, and full-set technical support. The final scope follows the confirmed hot filling project.
Product FAQ
Q1: Can the machine be evaluated for hot filling?
Yes. Hot filling is a project direction. Product temperature, bottle material, cap, liquid, thermal service, and test conditions require review.
Q2: Can the bottle and cap be checked for the hot filling route?
Yes. Bottle geometry, material, neck, cap, liquid temperature, and handling conditions are reviewed together.
Q3: Can installation and commissioning support be arranged?
Yes. Project-based installation coordination, commissioning, operator guidance, workshop planning, and technical support can be discussed.
Q4: Can you supply a complete production line, not just a single machine?
A: Yes. We can supply complete turnkey lines including all processing equipment.
Q5: Can we visit your factory?
A: Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.