500kw Carbonated Beverage Production Line Canning Machine ISO Certificated
500kw Beverage Production Line
,ISO Certificated Beverage Production Line
,Carbonated beverage canning machine
This complete carbonated beverage production line integrates water treatment, sugar melting, soda mixing, formula adjustment, carbonation, filling, closure, inspection, coding, packing, CIP interfaces, and utilities into one coordinated beverage project. Key parameters including carbonation equipment, CO2 interface, pressure settings, isobaric filling, foam control, and closure equipment are confirmed based on project requirements and industry standards.
CIP (Clean-in-Place) interfaces are included as required, with cleaning sequences, circulation arrangements, chemical programs, and validation scope confirmed with the buyer. Technical guidance, process flow design, workshop layout design, installation, commissioning, and operator training may be included based on the confirmed project scope and agreement.
- Water and ingredient receiving: Process water, sugar, syrup, concentrate, powder, or other confirmed input routes are received according to product specifications
- Water treatment: Prepares process water to meet approved carbonated beverage specifications
- Sugar melting and syrup preparation: Includes sugar melting, syrup filtration, and formula adjustment as required by the confirmed recipe
- Soda mixing: Water, syrup, and other ingredients are mixed before the carbonation interface
- Carbonation interface: CO2 equipment, pressure, isobaric filling, foam control, and carbonation conditions are selected and confirmed per project
- Filling and closure: Matched to the selected container and buyer-confirmed production interface
- Inspection and coding: Inspection, coding, and line checks prepare filled units for downstream handling
- Labeling and secondary packing: Labeling, drying, film, carton, and conveying modules follow the confirmed packaging plan
- CIP interface: CIP connections and cleaning circulation coordinated with process and filling sections
- Utilities and technical interfaces: Water, steam, air, boiler, layout, installation, commissioning, and technical guidance interfaces agreed per project
The reference design range for this complete beverage line is 2,000 to 36,000 bottles per hour. This represents a planning range for the complete line, not fixed ratings for individual machines. Formula, container type, treatment route, utilities, workshop area, and automation scope are reviewed together during project planning.
Higher capacities above 36,000 bottles per hour can be customized according to product, container, process, and automation requirements. There is no fixed upper limit for customization. Final output, utility demand, and route-specific modules are confirmed at the design stage.
The line is supplied as a coordinated project with process flow design, workshop layout design, installation and commissioning support, operator training, and technical guidance where included in the confirmed project scope. The final arrangement depends on recipe, ingredient route, container type, treatment path, utilities, workshop conditions, and agreed automation scope.
| Model | Output (bottles/hour) | Steam Consumption (KG) | Power (kW) | Area Required (m²) |
|---|---|---|---|---|
| SWGZ-2000 | 2,000 | 500 | 100 | 500 |
| SWGZ-4000 | 4,000 | 1,000 | 150 | 800 |
| SWGZ-6000 | 6,000 | 2,000 | 200 | 1,000 |
| SWGZ-10000 | 10,000 | 3,000 | 350 | 1,500 |
| SWGZ-15000 | 15,000 | 4,000 | 420 | 2,000 |
| SWGZ-24000 | 24,000 | 6,000 | 500 | 2,500 |
| SWGZ-36000 | 36,000 | 8,000 | 600 | 3,000 |
Note: Actual output is designed according to product, container, process, workshop, and automation requirements and is not limited to these seven classes. Capacities above 36,000 bottles/hour can be customized according to project requirements, with no fixed upper limit. Final model, steam, power, area, and equipment selection are confirmed at design stage.
- Coordinated integration of water treatment, sugar melting, soda mixing, filling, inspection, packing, and CIP interfaces
- Project-confirmed parameters for CO2, pressure, isobaric filling, foam control, closure, and cleaning
- Technical guidance and project services bounded by confirmed scope and agreement
- Process flow and workshop layout design supporting complete-line engineering and utility review
- Reference output classes supporting planning while maintaining customizability
Suitable for carbonated beverage factories, soda brands, beverage contract manufacturers, and production-line renovation projects. Applications include water treatment, sugar melting, soda mixing, carbonation integration, filling, inspection, coding, CIP interface planning, and secondary packing.
Packaging formats, carbonation equipment, CO2 arrangements, cleaning scope, utilities, automation, and technical guidance are confirmed before engineering. Capacity is planned with reference to 2,000-36,000 bottles/hour, while output above that range can be customized according to project requirements.