Automatic Soft Drink Manufacturing Machinery Soda Can Production Line OEM
Automatic soft drink manufacturing machinery
,OEM soft drink manufacturing machinery
,OEM soda can production line
This complete flavored sparkling water production line integrates water treatment, flavor/syrup preparation, formula blending, carbonation, filling, closure, inspection, coding, packing, CIP interfaces, and utilities. The system coordinates all processing stages for efficient sparkling water production.
CIP integration involves coordinated interface planning rather than fixed automatic programs. Carbonation parameters, CO₂ usage, pressure settings, flavor balance, residue control, and changeover conditions are confirmed per project requirements.
- Water receiving and treatment: Process water treatment according to sparkling water and flavor specifications
- Flavor ingredient receiving: Handling of flavors, sugars, acidulants, concentrates, and powders per approved recipes
- Flavor or syrup preparation: Dissolution, syrup preparation, or ingredient dosing based on project formulas
- Formula blending: Flavor formula blending before carbonation and filling
- Carbonation interface: Project-confirmed carbonation, CO₂ supply, pressure, and foam control
- Filling and closure: Container-matched filling and closure systems
- Inspection and coding: Quality inspection, coding, and line checks
- Labeling and secondary packing: Labeling, drying, film wrapping, cartoning, and conveying
- CIP integration: Coordinated cleaning interface planning with processing and filling systems
- Utilities and technical interfaces: Water, steam, air, boiler, layout, and commissioning support
Reference design range: 2,000 to 36,000 bottles per hour for complete beverage lines. This represents a planning range rather than fixed ratings for individual machines.
Higher capacities above 36,000 bottles per hour can be customized based on product, container, process, and automation requirements. Final output, utility demand, and route-specific modules are confirmed during design stages.
Supplied as coordinated projects including process flow design, workshop layout design, installation and commissioning support, operator training, and technical guidance (subject to confirmed project scope). Final arrangements depend on recipe, ingredient routes, containers, treatment paths, utilities, workshop conditions, and automation scope.
| Model | Output (bottles/hour) | Steam Consumption (KG) | Power (kW) | Area Required (m²) |
|---|---|---|---|---|
| SWGZ-2000 | 2,000 | 500 | 100 | 500 |
| SWGZ-4000 | 4,000 | 1,000 | 150 | 800 |
| SWGZ-6000 | 6,000 | 2,000 | 200 | 1,000 |
| SWGZ-10000 | 10,000 | 3,000 | 350 | 1,500 |
| SWGZ-15000 | 15,000 | 4,000 | 420 | 2,000 |
| SWGZ-24000 | 24,000 | 6,000 | 500 | 2,500 |
| SWGZ-36000 | 36,000 | 8,000 | 600 | 3,000 |
Note: Actual output is designed according to product, container, process, workshop, and automation requirements. Capacities above 36,000 bottles/hour can be customized with no fixed upper limit. Final specifications are confirmed at design stage.
- Dedicated focus on flavored sparkling water and formula blending
- Coordinated water treatment, flavor preparation, blending, carbonation, filling, and packing
- CIP integration as interface planning (not fixed automatic programs)
- Project-confirmed CO₂, pressure, flavor balance, and residue control
- Process flow and workshop layout supporting multi-formula production
- Reference output classes with fully customizable final capacity
Ideal for flavored sparkling water factories, carbonated beverage brands, multi-formula contract manufacturers, and beverage expansion projects. Applications include comprehensive water treatment, flavor/syrup preparation, formula blending, carbonation integration, filling, inspection, coding, CIP interface planning, and secondary packing.
All packaging, flavor recipes, changeover plans, cleaning scope, output, utilities, and service arrangements are confirmed before engineering. Capacity planning references 2,000–36,000 bottles/hour, with customization available above this range.
Yes. We build equipment to your required output in liters per hour or units per hour.
Yes. We can also send engineers to your site for hands-on installation, commissioning, and operator training.
Yes. We can supply complete turnkey lines including all processing equipment.
Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.