Industrial Ice Cream Production Line Equipment Pasteurization Machine 80kw
Industrial ice cream production line equipment
,80kw ice cream production line equipment
,80kw ice cream pasteurization machine
This process-focused industrial ice cream processing line is organized around the technical connection between milk or milk powder reception, standardization, formulation and blending, pasteurization, homogenization, cooling, aging, freezing, filling, and cold storage. The arrangement helps engineering teams review mix preparation, thermal treatment, aging, freezing, filling, CIP, refrigeration, water, steam, and air interfaces as one integrated system. Capacity, process route, and automation are developed around specific plant requirements.
- Process-centered design from mix preparation through frozen product filling
- Clear connection between pasteurization, homogenization, cooling, aging, and freezing
- Process flow and workshop planning support for equipment integration projects
- Commissioning communication focused on startup sequence and production handover
- Package flexibility for plastic cups, cones, tubs, and selected filling formats
- Capacity and automation planning aligned with expansion and production objectives
- Milk and powder reception: Milk, milk powder, and other ingredients enter the process route selected for the ice cream mix
- Standardization: Mix composition is prepared around fat, solids, sugar, and formulation requirements
- Ingredient dosing and blending: Recipe components are dosed and blended into a uniform mix
- Pasteurization: Pasteurization provides the planned thermal treatment stage before homogenization and cooling
- Homogenization: The mix passes through a homogenization stage connected to the process design
- Cooling and transfer: The treated mix is cooled and transferred toward the aging section
- Aging: Aging tanks or holding equipment are arranged to support the planned mix sequence before freezing
- Freezing: The freezing section prepares the mix for filling into the selected package
- Filling and conveying: Filling, transfer, and conveying modules connect the frozen product route with cup, cone, or tub handling
- CIP and plant services: CIP, cold water, ice water, steam, compressed air, refrigeration, and utility interfaces are coordinated for the process line
The four configurations below cover common planning levels for ice cream production. Actual output, process route, and automation can be customized to the product portfolio, workshop plan, package format, and expansion program.
| Model | Output (cups/hour) | Steam Consumption (KG) | Power (kW) | Area Required (m²) |
|---|---|---|---|---|
| SWBSN-2000 | 2,000 | 300 | 80 | 500 |
| SWBSN-4000 | 4,000 | 500 | 120 | 800 |
| SWBSN-6000 | 6,000 | 600 | 150 | 1,000 |
| SWBSN-10000 | 10,000 | 1,000 | 200 | 1,500 |
Process design support helps organize the mix room, pasteurization and homogenization section, cooling and aging area, freezing section, filling route, cold storage, and utility connections. Commissioning support can focus on installation interfaces, startup sequence, material transfer, equipment checks, cleaning coordination, and production handover.
Technical discussions can also cover recipe changeover, package selection, filling connections, refrigeration requirements, and expansion planning. This engineering-oriented approach helps factories connect process equipment into a practical operating route rather than selecting isolated machines. The final arrangement follows the product range, formula, package format, workshop conditions, and production target, with automation options selected to match the plant plan.
This processing line is suited to dairy plants, ice cream process engineering projects, equipment integration programs, and production-line expansions. Applications include ice cream mix processing, milk powder ice cream, plastic cup filling, cone filling, tub filling, and cold storage connection.
The same processing route can be adapted to suitable gelato-style and frozen dessert products when their recipes fit the equipment plan. The main focus remains industrial ice cream processing, with links between standardization, formulation, pasteurization, homogenization, cooling, aging, freezing, filling, and cold storage. CIP, refrigeration, utilities, package handling, and automation can be organized around the factory engineering plan.