A hygienic milk powder line places cleaning access and process order at the center of the design. The complete route from reception to packing is planned so that product-contact equipment, transfer lines, tanks, and powder handling areas can be cleaned and inspected in a practical sequence. CIP planning is reviewed together with the process layout, cleaning routes, return lines, drains, and release checks. This approach supports orderly operation without relying on a specific material grade or certification claim.
Reception, standardization, blending, homogenization, and pasteurization are arranged with cleaning access in mind. Concentration, spray drying, powder handling, and packing are connected with defined transfer and cleaning points. CIP routes can be reviewed for tanks, pipework, valves, filters, and powder-contact equipment. The cleaning sequence, inspection points, and release checks are planned with the buyer during project design. The SWNF model range provides line-level references for capacity, steam, power, and workshop area.
A clean design review covers every product-contact surface and every branch that needs cleaning coverage. Shared and dedicated routes can be reviewed when different products or campaigns are planned. Powder-contact areas require particular attention to access, dust control, moisture management, and restart checks. The operating team receives clear procedures for routine cleaning, inspection, and changeover so that hygienic performance is built into everyday production. The line is presented as an engineering concept; specific surface finishes and cleaning validation remain part of the project review.
For reference; final specifications depend on process requirements. Hourly capacity refers to liquid milk processed per hour.
| Model | Hourly Capacity (L liquid milk per hour) | Steam Consumption (KG) | Power Consumption (KW) | Required Workshop Area (m²) |
|---|---|---|---|---|
| SWNF-1000 | 1000 L | 1000 KG | 50 KW | 300 m² |
| SWNF-2000 | 2000 L | 2000 KG | 80 KW | 500 m² |
| SWNF-3000 | 3000 L | 3000 KG | 100 KW | 800 m² |
| SWNF-5000 | 5000 L | 5000 KG | 150 KW | 1000 m² |
- Cleaning access and process order are planned together across the complete line.
- CIP routes can be reviewed for tanks, pipework, filters, and powder-contact areas.
- Cleaning and inspection points are defined with the operating routine in mind.
- Line-level parameters support capacity and workshop planning.
This solution can be considered for dairy plants prioritizing clean design and CIP planning in a complete milk powder line. The complete route is planned around the buyer's formulation, capacity target, workshop conditions, and plant utilities.