logo
Home > Products > Aseptic Brick Filling Machine > Aseptic Brick Pack Filling and Packaging Machine

Aseptic Brick Pack Filling and Packaging Machine

Place of Origin
Shanghai, China
Brand Name
Shangwang
Minimum Order Quantity
1 Set
Packaging Details
Export standard packaging
Delivery Time
60 working days
Payment Terms
T/T,L/C,Western Union
Product Attributes
Highlight:

aseptic brick pack filling and packaging machine

,

brick pack beverage filling equipment

,

liquid drink brick pack packaging

Material:
Stainless Steel
After-sales Service:
Project-based Installation, Commissioning, Training And After-sales Support
Application:
Liquid Beverage Packaging
Brick Pack Range:
200-2,000 ML Project Reference
Automation:
Configurable According To Project Requirements
Control:
PLC Control
Product Description
Reading Progress
0%

Product Overview

Aseptic Brick Pack Filling and Packaging Machine. This equipment is planned for confirmed liquid beverage projects that require a connected brick pack filling, closure, conveying, and downstream packaging route. Prepared liquid beverage is supplied to the equipment, product temperature conditioning is reviewed as required, brick packs are filled, closure or cap application is coordinated, and finished packages move by conveyor to the confirmed downstream packing interface.
The reference product filling temperature is 5-25°C, and main machine capacity is 16,000 pcs/hour. A separate 16,000-18,000 packages/hour reference requires project-level alignment of package counting and closure-system definitions before final use. The ±1% filling accuracy value is a reference subject to product, package, equipment, and test conditions. It is not an unconditional result guarantee. Brick pack volume and material are reviewed within the 200-2,000 mL project reference range.
Cap applicator, cap sorter, cap hoist, conveyor belt, closure, and downstream packing interfaces can be coordinated according to the package route. Upstream beverage preparation, filtration, homogenization, sterilization, cleaning, and downstream packing are reviewed as project interfaces rather than assumed fixed configurations. Power, compressed air, steam, softened water, and cooling water are checked against factory utilities. Automation and control can be configured according to project requirements. Workshop layout planning, installation coordination, commissioning, and full-set technical guidance can support the project.

Applications

This equipment can be considered for confirmed liquid beverage packaging projects, including fruit juice, tea beverage, coffee drink, protein drink, non-soda drink, and fruit wine. The product type, viscosity, particles or fiber, temperature, package volume, material, closure, utility conditions, and downstream route require project review. The page focuses on filling and packaging coordination rather than a specific beverage formula.

Line Modules

  1. Prepared beverage inlet. The liquid product connection is reviewed with the upstream process and transfer arrangement.
  2. Product conditioning interface. Product temperature and transfer conditions are checked according to the project.
  3. Aseptic brick pack filling section. The filling section is configured for the confirmed package route.
  4. Package forming and sealing interface. Brick pack forming and closure are coordinated with selected material and format.
  5. Cap applicator. A cap applicator can be reviewed when required by package design.
  6. Cap sorter. Cap sorting is coordinated with cap type and package supply.
  7. Cap hoist. Cap transfer is reviewed with the selected cap handling arrangement.
  8. Conveyor belt. The conveyor connects filled packages with discharge and downstream packing.
  9. Utility connections. Power, air, steam, softened water, and cooling water interfaces are reviewed for the site.
  10. Downstream packaging interface. Filled brick packs are transferred to the confirmed finished package route.

Process Flow

Prepared liquid beverage supply → product temperature conditioning as required → aseptic brick pack filling → sealing, capping, or package closure as configured → conveyor discharge → downstream packaging.
Upstream treatment, filtration, homogenization, sterilization, and cleaning are connected only when confirmed as project interfaces. Package volume, material, closure, utilities, and downstream packing are selected by application.

Equipment Parameters

ParameterReference Value
Equipment ClassificationAseptic brick filling machine
Main Capacity16,000 pcs/hour
Filling Temperature5-25°C
Filling Accuracy±1%, subject to test conditions
Power Supply380±10 V, 50 Hz
Power42 kW
Compressed Air600-700 kPa; 450 L/min
Steam170±30 kPa; 125-140°C; 2.5 kg/h
Softened Water300-450 kPa; ≤30°C
Cooling Water300-450 kPa; ≤20°C
Main Machine Weight10,000 kg
Main Dimension6,150*3,768*5,500 mm
Conveyor21 m/min; height 825±50 mm
Brick Pack Range200-2,000 mL project reference
Cap Applicator3,100*1,000*2,000 mm
Cap Sorter1,100*1,600*2,000 mm
Cap Hoist800*2,000*2,700 mm
Cap Installation Size5,500*3,200*2,700 mm
Cap System Weight1,500 kg

These are reference values. The 16,000-18,000 packages/hour closure-system reference requires project-level alignment with the main pcs/hour counting method. Product, package, closure, utilities, and test conditions are confirmed before final configuration.

Technical Guidance and Services

Support can include product and package interface review, closure selection, utility coordination, workshop layout planning, installation coordination, commissioning, and full-set technical guidance. Upstream process and downstream packing interfaces are reviewed according to the project.

Product FAQ

Q1: What applications can be reviewed for this equipment?
Confirmed fruit juice, tea beverage, coffee drink, protein drink, non-soda drink, and fruit wine applications can be reviewed. Final compatibility depends on product and package conditions.
Q2: Can closure and package interfaces be configured?
Yes. Brick pack material, volume, closure, cap handling, conveyor, utilities, and downstream packaging are reviewed according to the project.
Q3: Can the reference filling temperature and capacity be used for planning?
Yes. 5-25°C and 16,000 pcs/hour are reference values. Product, package, test conditions, and project configuration must be confirmed.
Q4: Can you provide installation and project guidance?
Yes. Project-based installation coordination, commissioning, operator support, workshop layout planning, and full-set technical guidance can be discussed.

Ready To Get Started?
Contact Us Today For A Free Consultation And See How We Can Help Your Business Grow.