logo
Home > Products > Tomato Paste Production Line > Tomato Ketchup Production Line with Formulation and Sterilization

Tomato Ketchup Production Line with Formulation and Sterilization

Place of Origin
Shanghai, China
Brand Name
Shangwang
Certification
ISO 9001
Model Number
SW
Minimum Order Quantity
1 Set
Packaging Details
Export standard packaging
Delivery Time
3-6 months
Payment Terms
T/T,L/C,Western Union
Product Attributes
Highlight:

tomato ketchup production line

,

tomato ketchup processing line

,

ketchup formulation and filling line

Material:
Stainless Steel 304/316
After-sales Service:
Project-based Installation, Commissioning, Training And After-sales Support
Product Category:
Fresh Tomato Ketchup Processing Line
Raw Material:
Fresh Tomato And Confirmed Ketchup Ingredients
Finished Product Format:
Tomato Ketchup In A Confirmed Retail Or Bulk Package Format
Fresh Tomato Processing Design Range:
10-1500 T/day
Automation:
Automation Configurable According To Project Requirements
Control:
PLC Control
Product Description
Reading Progress
0%

Product Overview

Tomato Ketchup Production Line with Formulation and Sterilization. This complete line is planned for fresh tomato ketchup projects that need a connected route from raw material preparation to formulation, sterilization, filling, and finished product packaging. The front end can include raw material lifting, cleaning, sorting, crushing, preheating and enzyme deactivation, and pulping. Vacuum concentration may be reviewed when required by the confirmed ketchup route, while the central project focus remains formulation, process coordination, sterilization, and filling.

Formulation is arranged according to the customer recipe, ingredient connections, product format, and filling plan. The specific mixing sequence, recipe connections, package type, and process conditions are confirmed during project planning. Sterilization is included as a project stage according to the selected route, without presenting a fixed treatment result or fixed process condition. Retail pack filling or aseptic large bag filling may be reviewed according to the customer’s intended product supply format.

The fresh tomato processing design range is 10-1500 T/day. Reference process capacity is 200-2000 kg/h, while reference plant needs are 200-800 m² and reference staffing is 3-7 workers. Automation, control, and packaging are configurable according to project requirements. CIP, water systems, formulation equipment, sterilization, conveyors, filling, and packaging interfaces are selected according to the confirmed ketchup application.

Process flow design, workshop layout planning, and full-set technical guidance can support the project. The final recipe, formulation connections, sterilization arrangement, filling format, cleaning coordination, utility needs, and package route are confirmed with the customer before the equipment scope is finalized.

Applications

This line can be considered for tomato ketchup factories, foodservice ketchup supply, seasoning and condiment projects, and fresh tomato plants adding a ketchup route. Tomato ketchup is the primary product direction. Recipe, ingredient additions, package format, and filling arrangement are reviewed according to the customer application. The line can connect fresh tomato processing with ketchup formulation and finished product handling.

Line Modules

  • 1. Raw material lifting. Fresh tomato is transferred from receiving to the preparation section.
  • 2. Cleaning. Cleaning is arranged around the incoming fresh tomato and project handling sequence.
  • 3. Sorting. Sorting supports removal of unsuitable material before crushing.
  • 4. Crushing. Crushing prepares fresh tomato for preheating and pulping.
  • 5. Preheating and enzyme deactivation. This stage can be included according to the selected ketchup process.
  • 6. Pulping. Pulping prepares the tomato base for formulation.
  • 7. Formulation. Formulation equipment connects the tomato base with the confirmed ketchup recipe.
  • 8. Sterilization. Sterilization is reviewed according to the process and filling plan.
  • 9. Filling. Retail pack filling or aseptic large bag filling can be selected according to the project.
  • 10. Finished product packaging. Conveyors and packaging interfaces connect filling with finished goods handling.

Process Flow

Fresh tomato receiving → raw material lifting → cleaning → sorting → crushing → preheating and enzyme deactivation as required → pulping → vacuum concentration as required → formulation → sterilization → retail pack filling or aseptic large bag filling → finished product packaging.

The recipe, mixing sequence, sterilization stage, filling format, and package handling are confirmed according to the customer ketchup project.

Equipment Parameters

Model Reference Process Capacity Reference Plant Area Reference Workers
SW-200 200–400 kg/h 200–300 m² 3–4 workers
SW-500 500–800 kg/h 300–450 m² 3–5 workers
SW-1000 1,000–1,200 kg/h 400–600 m² 4–6 workers
SW-1500 1,500–1,700 kg/h 500–700 m² 5–7 workers
SW-2000 2,000 kg/h 600–800 m² 6–7 workers

Technical Guidance and Services

Project support can include process flow design, workshop layout planning, formulation sequence review, utility coordination, sterilization and filling interface review, packaging selection, and full-set technical guidance. Installation, commissioning, and operator support can be arranged on a project basis. The final service scope, schedule, documents, and site requirements are confirmed before implementation.

Product FAQ

Q1: Can the ketchup line capacity be customized?

Yes. The 10-1500 T/day fresh tomato processing design range supports planning, while the actual line is designed around the target, recipe, package route, and plant conditions.

Q2: Can the line be planned for a customer ketchup formulation?

Yes. Formulation equipment and ingredient connections can be reviewed according to the confirmed recipe, mixing sequence, product format, and filling plan.

Q3: Can sterilization and retail pack filling be included?

Yes. Sterilization and retail pack filling can be connected according to the selected ketchup route. Aseptic large bag filling may also be reviewed when required by the project.

Q4: Can you provide complete ketchup line planning?

Yes. Process flow design, workshop layout planning, equipment coordination, project-based installation support, commissioning, and full-set technical guidance can be discussed.

Ready To Get Started?
Contact Us Today For A Free Consultation And See How We Can Help Your Business Grow.