logo
Home > Products > Bottled Water Production Line > Custom Capacity Bottled Water Production Line for Purified and Mineral Water

Custom Capacity Bottled Water Production Line for Purified and Mineral Water

Place of Origin
Shanghai, China
Brand Name
Shangwang
Certification
ISO 9001
Model Number
SWPZ
Minimum Order Quantity
1 Set
Packaging Details
Export standard packaging
Delivery Time
3-6 months
Payment Terms
T/T,L/C,Western Union
Product Attributes
Highlight:

custom bottled water production line

,

custom water bottling plant

,

custom output bottled water line

Model Number:
SWPZ
After-sales Service:
Project-based Installation, Commissioning, Training And After-sales Support
Product Category / Water Route:
Custom Capacity Bottled Water Line
Automation:
Project-configured Line Automation
Product Description
Reading Progress
0%

Product Overview

Custom Capacity Bottled Water Production Line for Purified and Mineral Water. The complete route covers water source and pretreatment, water treatment, sterilization, bottle blowing or bottle infeed, filling, lamp inspection, cap sorting, coding, film packing, and finished goods. Purified water and mineral water can be addressed as separate or combined project directions, with the treatment and bottle route coordinated around the factory plan. Bottle volumes from 350–1,500 mL can be used as the reference range for planning, while actual capacity can be customized to customer requirements and is not limited to the seven reference classes. Workshop area, utilities, bottle handling, filling, inspection, coding, film packing, and finished-goods movement can be organized around the selected output target. This approach gives buyers a complete project route rather than a fixed single-machine package, while keeping source preparation, water treatment, sterilization, packaging, and finished products connected.

Features

  • Complete route from water source and pretreatment to treatment, sterilization, filling, inspection, coding, packing, and finished goods.
  • Connects bottle handling, water treatment, filling, and downstream package movement.
  • Supports bottle volumes from 350–1,500 mL as a reference planning range.
  • Coordinates lamp inspection, cap sorting, coding, film packing, and finished-goods transfer.
  • Allows water route, package format, workshop arrangement, and utilities to follow the project plan.
  • Actual capacity can be customized to customer requirements and is not limited to the seven reference classes.

Line Modules

Water source and pretreatment. The incoming water route is prepared before treatment.

Water treatment. Source-specific treatment stages are arranged in the process route.

Sterilization. Sterilization is placed before the bottle filling sequence.

Bottle blowing or bottle infeed. Bottle handling is planned around PET bottle production or supplied bottles.

Filling. The treated water route connects with the selected filling arrangement.

Lamp inspection. Filled bottles move through the inspection stage before downstream handling.

Cap sorting. Cap sorting supports orderly closure handling before coding.

Coding. Coding is arranged with the package movement route.

Film packing. Film packing connects secondary packaging with finished-goods transfer.

Finished goods. Conveying, utilities, workshop interfaces, and finished-goods handling complete the line.

Equipment Parameters

The seven configurations below cover common planning levels for bottled water projects. Actual capacity can be customized to customer requirements and is not limited to these seven reference classes.

Model Output (bottles/hour) Bottle volume Power (kW) Area required (m²)
SWPZ-2000 2,000 350–1,500 mL 50 300
SWPZ-5000 5,000 350–1,500 mL 110 500
SWPZ-10000 10,000 350–1,500 mL 160 800
SWPZ-15000 15,000 350–1,500 mL 230 1,000
SWPZ-18000 18,000 350–1,500 mL 280 1,200
SWPZ-24000 24,000 350–1,500 mL 350 1,500
SWPZ-36000 36,000 350–1,500 mL 500 2,000

Technical Guidance and Services

Technical guidance can cover water source routing, pretreatment, water treatment, sterilization, bottle blowing or bottle infeed, filling, lamp inspection, cap sorting, coding, film packing, utilities, and finished goods. Installation support and commissioning communication can be organized around the selected line arrangement, while operator training can introduce the production sequence, bottle handling, filling handover, package movement, and routine operation. Workshop coordination can connect water treatment, bottle handling, filling, inspection, coding, packing, utilities, and finished-goods transfer. The service route is designed to help customers organize a complete bottled water project from source to packaged product.

Applications

Multi-format bottled water factories, purified and mineral water combination projects, capacity expansion, production line upgrades, and water plant projects planned around an existing workshop. Applications include source preparation, treatment, sterilization, bottle handling, filling, inspection, coding, film packing, and finished goods.

Product FAQ

Q1: Can you customize the equipment to match our production capacity?

Yes. We build equipment to your required output in liters per hour or units per hour.

Q2: Do you provide installation and commissioning support?

Yes. We can also send engineers to your site for hands-on installation, commissioning, and operator training.

Q3: Can you supply a complete production line, not just a single machine?

Yes. We can supply complete turnkey lines including all processing equipment.

Q4: Can we visit your factory?

Yes. Factory visits are welcome. Our factory is located in Fengxian District, Shanghai, China, a 40-minute drive from Shanghai Pudong International Airport. Please contact us to schedule your visit. Video factory tours are also available for customers who cannot travel.

Ready To Get Started?
Contact Us Today For A Free Consultation And See How We Can Help Your Business Grow.